 |
 |
 |
 |
2B: C Rated All Metal Valve Construction Uses all recycled gas in accordance with the Montreal protocol No thermal or static shock Good visibility during discharge May Take 2-4 Weeks for Delivery - Warning: A minimum of 156 cu. ft. is required for use
|
|
 |
 |
|
 |
 |
 |
 |
 |
Features
- *Dependable Drawn Steel Cylinders
*All Metal Valve Construction *Uses all recycled gas in accordance with the Montreal Protocol *Reclaimed Halon 1211 is restored to original military specifications *Leaves no residue *Maximum visibility during discharge *No electrical conductivity back to the operator *No thermal or static shock *Bar Coded and Bi-lingual Labels
|
|
 |
 |
 |
 |
|
 |

|